
To accurately keep track of earthwork progress,
it is necessary to measure the current cut/fill volumes
in comparison with the planned amount.
Detailed Use Cases

Calculate the required cut/fill amount based on current earthwork volumes

Generate elevation profile and calculate volumes without manual survey

Adjust cost calculation based on monthly earthwork progress
Before

-
Difficult to create accurate survey measurements due to human errors and sparse manual survey points
-
Expensive and time consuming to verify survey results
After

-
Accurately measure earthwork amounts in centimeter accuracy
-
Easily track earthwork change with survey comparison based on date (time and cost saving up to 80%)